China
Service Provider
Cangzhou Leader steel pipe Co., ltd. is one of leading suppliers of steel pipe, pipe fittings in North China. Located in the land of steel pipe and fittings, —Cangzhou Mengcun, near Tianjin port, with traffic on the edge, you can in the first time to get products. We have a large modern high standard of warehouse with inventory more than 10, 000 tons of steel pipe, thousands of varieties with high quality. All models, materials, standard steel pipe and fittings, are available in all varieties. Advanced and perfect testing equipment to ensure that the product qualified rate reach100%.Exported products get good comments from Russia, Kazakhstan, Brazil, South Africa, Germany, Morocco, Turkey, South Korea, Japan, Malaysia, Ukraine, Iran.etc. Main products: Oil casing pipe, precision steel pipes, seamless steel pipe, spiral steel pipe, straight seam welded pipe, alloy pipe, stainless steel pipe, steel pipe, tubing, hydraulic pillar pipe, line pipe and fittings The above products reach
Service Provider
Donghe Industrial Mengcun County Cangzhou City Hebei Province China
061000 Cangzhou - China
Netherlands
During the Nord Stream 2 project several Aerolift lifting solutions were used on multiple locations. It is world’s largest pipeline project. During the project, a pipeline is laid through the Baltic Sea, which will transport natural gas over 1,200 km. From the world’s largest gas reserves in Russia via the most efficient route to consumers in Europe. Over 200.000 pipe segments needed to be handled. Almost all handling movements are carried out by an Aerolift lifting solution!
Request for a quoteNetherlands
The Aerolift pipe lifting solutions are applied for many different situations and places. During production, storage, transhipment, and internal transport. For this specific situation we designed a lifting solution to handle bare and coated pipes aboard the ship. The ship, The Amazon, was converted to an ultra-deepwater J-Lay vessel. Our vacuum lifting devices are installed on 4 cargo hold cranes. In tandem mode the cranes will be used to load and unload 24-meter-long pipes in a cargo. The lifting devices are designed to limit deflection of double joint pipes or to handle the entire pipe by vacuum only.
Request for a quoteCreate one request and get multiple quotes form verified suppliers.