TopHat
CS100/UV-LED equipment -  COSMIC - ENGINEERING GMBH

Description

Using the Hat-system, connections in the sewer system can be rehabilitated permanently. To do that, we use seamless glass fiber laminate which increases the lifespan. The rehabilitation robot is equipped with a Hat-transfer-gear with a workfield of the diamter 100 to 200 mm.

it engineering -  industrial robotics - 
Cosmic Engineering GmbH Steinabruck 35 3072 Kasten
Austria
Request a quote
  • Max. 500 characters

  • Your address details
  • I agree to the EUROPAGES  terms and conditions and  privacy policy

  • Click to see
OTHER PRODUCTS FROM THIS COMPANY