China
Manufacturer/ Producer
Zhangqiu Yu Bin Petrochemical Fittings Factory was founded in 1999, has 20 years of Tube Sheet manufacturing experience, high precision machining equipment 50 units, testing equipment more than 10 units, senior technicians more than 60 persons, professional sales team more than 10 peoples. We have passed PED4.3 instructions, and have obtained the qualification of issuing EN10204-3.1, possess China special equipment production permit qualification. We are provide with forging, heat treatment, machining, inspection, product protection & marking etc.a series of complete process. To provide you with satisfactory OEM high quality CNC Machining Parts, Forged Parts, Shaft, Steel Bushing, Tube Sheet, Copper and Aluminium Products. Convenient for you understanding website is: www.machining.top, welcome you send the drawings and requirements , we will give feedback immediately.Thank you.
Manufacturer/ Producer
Chizitou Village,Puji Town,Zhangqiu,Jinan,Shandong Province,China.
250206 Puji,zhangqiu - China
Netherlands
During the Nord Stream 2 project several Aerolift lifting solutions were used on multiple locations. It is world’s largest pipeline project. During the project, a pipeline is laid through the Baltic Sea, which will transport natural gas over 1,200 km. From the world’s largest gas reserves in Russia via the most efficient route to consumers in Europe. Over 200.000 pipe segments needed to be handled. Almost all handling movements are carried out by an Aerolift lifting solution!
Request for a quoteNetherlands
The Aerolift pipe lifting solutions are applied for many different situations and places. During production, storage, transhipment, and internal transport. For this specific situation we designed a lifting solution to handle bare and coated pipes aboard the ship. The ship, The Amazon, was converted to an ultra-deepwater J-Lay vessel. Our vacuum lifting devices are installed on 4 cargo hold cranes. In tandem mode the cranes will be used to load and unload 24-meter-long pipes in a cargo. The lifting devices are designed to limit deflection of double joint pipes or to handle the entire pipe by vacuum only.
Request for a quoteCreate one request and get multiple quotes form verified suppliers.